After signing a quote for custom power electronics, the project kicks off immediately with a kickoff meeting and a detailed requirements phase, followed by design, prototyping, validation, and ultimately the transition to production. The process is structured around fixed, sequential phases, each with its own deliverables and approvals. In this article, we walk you through what to expect at each phase — from the first day after sign-off to post-delivery support.
What happens immediately after a quote is approved?
As soon as a quote for custom power electronics is approved, the project begins with a kickoff meeting. In that meeting, the project team and the client align on the schedule, communication channels, roles, and initial deliverables. This ensures everyone knows what is expected of them and when, right from day one.
The kickoff also establishes the working methods and tools to be used. If the team follows agile scrum, the first sprints are scheduled and the backlog is populated. If the team takes a more phase-based approach, the project plan is worked out in detail. Either way, the principle holds: the more concrete the agreements at the start, the smoother the process will run.
In addition to the schedule, the project organization is formally set up. This includes appointing a dedicated project manager, setting up a shared project portal, and defining escalation paths. For complex power electronics projects — where multiple disciplines such as electronics, embedded software development, and mechanical engineering converge — that structure is not a luxury but a necessity.
How does the requirements and specification phase work?
The requirements phase is the period in which the functional and technical requirements of the product are captured in a detailed specification document. This document forms the foundation for all design decisions that follow. A well-developed specification prevents costly changes later in the process.
In practice, this phase begins with a series of working sessions between the development team and the client. Together, you map out the use cases, environmental requirements, safety standards, and performance requirements. For power electronics, this includes defining voltage ranges, power levels, thermal limits, and any applicable certification requirements such as CE or IEC standards.
In addition to the technical requirements, non-functional requirements are also addressed: cost per unit, weight, dimensions, service life, and maintainability. All of these parameters influence the architectural choices in the next phase. The specification document is formally approved by both parties before actual development begins, giving both sides a clear reference point throughout the entire project.
What development phases does a custom power electronics project go through?
A custom power electronics project typically goes through four main phases: system architecture, electronics design, embedded software development, and integration. Each phase builds on the previous one and concludes with a formal review before the next phase begins. This structured progression ensures controlled advancement and early detection of issues.
System architecture and electronics design
The architecture phase determines the topology of the system. For power electronics, this involves decisions such as switching frequency, converter topology, component selection, and thermal strategy. At the same time, the PCB layout is prepared, with electromagnetic compatibility (EMC) and thermal management factored in from an early stage.
Programmable logic plays a significant role in many power electronics applications. VHDL and FPGA design are used for time-critical control algorithms that are too fast for a standard microcontroller. The choice of hardware architecture has a direct impact on the capabilities of the embedded software later in the process.
Embedded software development and integration
Once the hardware architecture is established, embedded software development begins. This involves developing the control algorithms, communication protocols, and safety logic. For IoT applications within power electronics — such as smart motor drives or connected charging stations — the cloud integration is also designed during this phase.
The integration phase combines hardware and software for the first time in a working system. This is the moment when theoretical designs meet reality. Minor deviations in component behavior or unexpected interference may become apparent here, after which the team makes targeted adjustments.
How are prototypes tested and validated?
Prototypes are tested through a combination of functional tests, load tests, and environmental tests. The goal of validation is to demonstrate that the design meets all requirements set out in the specification document. Only after a successful validation is the design released for the next phase.
Functional tests verify that the system does what it is supposed to do: does it switch at the correct voltage, does the control system respond quickly enough, does the IoT module communicate correctly with the cloud? Load tests push the system to its limits to observe how it behaves under extreme conditions, such as maximum current or high ambient temperature.
Environmental tests simulate real-world operating conditions. Depending on the application, these may include vibration tests, humidity tests, or EMC measurements. For power electronics in industrial environments, these tests are particularly relevant, as the equipment is exposed to harsh conditions. The test results are documented and shared with the client so that you can jointly decide whether the design is ready for production.
What does the transition to production (NPI) involve?
The transition to production, also known as New Product Introduction (NPI), is the process by which a validated prototype is transformed into a reproducible, cost-efficient product that can be manufactured at scale. NPI involves selecting manufacturing partners, optimizing the design for manufacturability, and establishing quality controls.
During NPI, the design is critically reviewed from a manufacturing perspective. Are all components available in the required volumes? Are the tolerances achievable for series production? Can the test procedures be transferred to the production line? These questions are answered in close collaboration with the manufacturing partner.
A well-executed NPI approach shortens time-to-market and reduces the risk of production issues after launch. Pilot runs — in which a small series is produced to validate the manufacturing process — are a standard part of this process. The results of the pilot run determine whether the product is ready for full series production.
What role do cybersecurity and certification play in the process?
Cybersecurity and certification are not separate steps at the end of the project — they are integrated throughout the entire development process. Power electronics with IoT functionality are subject to specific standards and regulations, including the European Cyber Resilience Act (CRA), which is having an increasing impact on connected products from 2026 onward.
Cybersecurity starts at the architectural level: which communication protocols are used, how are firmware updates secured, and how is access to the system authenticated? Secure connectivity is not only a technical requirement but also a commercial argument for end customers who do not want their systems exposed to unauthorized access.
Certification — such as CE marking or sector-specific standards — requires a structured approach to documentation and testing. By planning for this early in the process, you avoid having to make major last-minute changes at the end of the project in order to meet the required standards. An experienced development partner guides you through this process and ensures that the right tests are carried out at the right time.
What does post-delivery support look like?
Post-delivery support typically takes three forms: technical support during production, software updates and maintenance, and guidance on further product development. The exact scope depends on the agreements made at the start of the project and the product's current lifecycle stage.
In the period immediately following launch, technical support for the manufacturing partner is often the most valuable. Minor production issues or deviations in component behavior can be addressed quickly by the development team. For IoT products, the cloud environment and embedded software also require regular updates — both for functionality and for security.
As the product matures in the market, support shifts toward further development. Market feedback, new certification requirements, or changes in the supply chain may trigger a new development cycle. A partner who has been involved in building the product from the very beginning can take on that further development more efficiently than a new party that first needs to get up to speed.
At Inspiro, we support projects from the initial requirements session through to well after the production launch. Whether it involves embedded software development, power electronics, or IoT solutions — we stay involved for as long as you need us. Contact us to discuss how we can support your project.