How is quality assured during the co-development process for custom electronics?

16 July 2026

Quality in custom electronics is ensured by building quality requirements into the very first design, combined with structured testing and verification checkpoints throughout the entire development process. This applies to embedded software development as well as to power electronics and IoT solutions. In this article, we answer the most frequently asked questions about quality assurance in co-development projects, from the initial design phase through to production.

What quality standards apply to custom electronics?

Multiple quality standards apply to custom electronics, depending on the application. The most commonly used are IEC 61508 for functional safety, ISO 9001 for quality management systems, and IPC-A-610 for the quality of electronic assemblies. Which standard applies depends on the sector and the intended use of the product.

In practice, this means that at the start of a project you need to carefully determine the environment in which the product will operate. An IoT sensor for a consumer application has different requirements than a motor drive for industrial robotics or a charging station for electric vehicles. Power electronics projects are often subject to stricter safety standards, because errors here can have direct physical consequences.

In addition to formal standards, sector-specific guidelines also play a role. These include CE marking for the European market, the RED (Radio Equipment Directive) for wireless devices, and EMC directives that are relevant to virtually every electronic product. It is wise to identify these requirements as early as the quotation phase, so they do not come as surprises during certification.

How is quality built in from the first design phase?

Quality is built in by making deliberate choices about architecture, component selection, and testability during the design phase itself. This is known as "design for quality" or "design for testability." By incorporating quality requirements as a design parameter, you prevent problems from surfacing late in the process, when changes are far more costly.

In concrete terms, this means a design team answers the following questions at the start of a project:

  • What environmental conditions must the product withstand, such as temperature, humidity, and vibration?
  • What reliability requirements apply to the product's service life?
  • How will the product be tested later, both during production and in the field?
  • Which components are available and reliably high-quality over the long term?

In embedded software development, this translates into the use of coding standards such as MISRA-C, the application of static code analysis, and the creation of a modular software architecture that is easy to test and maintain. For hardware, simulations and FMEA (Failure Mode and Effects Analysis) are applied early in the design process to identify weak points.

A solid requirements phase is the foundation for all of this. When functional and non-functional requirements are clearly documented, the design team can make informed decisions. Unclear or shifting requirements are one of the greatest risk factors for quality problems later in the process.

What is the role of testing and verification in embedded systems?

In embedded systems, testing and verification are the means of demonstrating that the product does what it is supposed to do, under the right conditions and within the specified requirements. Without structured testing, there is no objective evidence of quality. In embedded software development, this encompasses unit tests, integration tests, system tests, and acceptance tests.

What makes embedded systems unique is that software and hardware are closely intertwined. A bug in the embedded software can damage hardware, and a hardware fault can make software behavior unpredictable. Verification therefore focuses on the entire system, not just the software or hardware in isolation.

Types of tests in embedded development

In practice, we distinguish several testing layers, each serving a different purpose:

  • Unit tests: Testing individual software modules for correct operation.
  • Hardware-in-the-loop (HIL) tests: Testing embedded software in combination with simulated or real hardware.
  • Integration tests: Verifying that subsystems work together correctly.
  • System tests: Validating the complete product under realistic conditions.
  • Environmental tests: Testing for temperature, EMC, vibration, and other external factors.

Verification versus validation

Verification answers the question: "Are we building the product right?" Validation answers the question: "Are we building the right product?" Both are necessary. Verification checks whether the design meets the specifications. Validation checks whether the final product meets the actual needs of the user. In co-development projects, it is advisable to plan both explicitly and to actively involve the client in the validation phase.

How does a co-development partner monitor quality during the project?

A co-development partner monitors quality by using a structured development process with fixed review and testing checkpoints, combined with transparent communication with the client. In practice, many teams work with agile scrum, where each sprint ends with a demo and a retrospective that addresses quality aspects.

Quality monitoring during the project consists of several layers:

  1. Code reviews: Every change to the embedded software is reviewed by a fellow engineer before it is accepted.
  2. Design reviews: At fixed points in the process, the hardware or software design is formally assessed by the team and sometimes by the client.
  3. Test reports: Test results are documented and shared, giving the client insight into progress and any outstanding issues.
  4. Traceability: Every requirement is traceable to a test case, providing demonstrable evidence that all requirements have been verified.

Beyond these formal measures, day-to-day collaboration is at least equally important. A good co-development partner asks questions when requirements are unclear, proactively flags risks, and openly discusses quality trade-offs with the client. Quality is not a final inspection — it is an ongoing conversation.

What quality risks are specific to IoT and power electronics projects?

IoT projects and power electronics projects each carry their own specific quality risks. In IoT, the primary concerns are cybersecurity, the reliability of wireless connections, and integration with cloud platforms. In power electronics, the risks are more focused on thermal management, electromagnetic interference, and functional safety at high power levels.

Quality risks in IoT development

In IoT solutions, the following risks are most relevant:

  • Cybersecurity: Connected devices are vulnerable to attacks if security has not been incorporated into the design from the outset. Examples include insecure firmware updates, weak authentication, or unencrypted communications.
  • Connectivity reliability: Wireless connections such as LoRa, Bluetooth, or LTE may perform differently in real-world conditions than in a laboratory environment. This must be tested early.
  • Scalability of cloud services: An IoT system that works with ten devices must also function reliably with ten thousand devices. Architectural choices in the cloud environment determine whether this is achievable.
  • Energy efficiency: Battery-powered IoT devices must be power-efficient. Poor software choices can significantly reduce battery life.

Quality risks in power electronics

Power electronics projects bring different challenges:

  • Thermal management: Components handling high power levels generate heat. Inadequate cooling leads to premature failure or fire.
  • EMC (electromagnetic compatibility): Switching power levels generate electromagnetic interference that can affect other systems. EMC testing is mandatory for CE marking and must be factored into the design early on.
  • Functional safety: In motor drives, charging stations, or other high-power applications, failures can lead to dangerous situations. This requires a systematic approach to risk analysis and safety architecture.
  • Component quality and availability: Specific power components can have long lead times or may be discontinued. This risk must be addressed during the design phase.

How does quality assurance work toward production and NPI?

Quality assurance toward production and NPI (New Product Introduction) focuses on transferring the developed product to a production environment without any loss of quality. This requires detailed production documentation, test specifications for the production line, and a controlled validation process for the first production batches.

The transition from prototype to production is a phase in which quality issues frequently emerge if it is not properly managed. A design that works perfectly in the lab can cause problems in series production due to component tolerances, variations in the production process, or logistical challenges.

A sound NPI approach includes the following steps:

  1. Design for Manufacturing (DFM) review: Verify that the design can be manufactured using available production resources and within acceptable costs.
  2. Pilot production: Produce a small series to validate the production process before scaling up.
  3. Production test specifications: Establish clear test procedures that can be carried out on the production line, including limit values and rejection criteria.
  4. First Article Inspection (FAI): Thoroughly inspect the first production batch against all relevant parameters.
  5. Documentation handover: Ensure that all relevant documentation — including schematics, BOM, firmware, and test procedures — is complete and up to date.

For IoT products, the provisioning of devices, the activation of connectivity, and the linking to cloud platforms are also part of the production process. These must be included in the NPI planning.

At Inspiro, we guide clients through the entire process, from the first design decisions through to series production and beyond. We work with flexible production partners who align with the specific requirements of your project, ensuring that the quality built up during development is maintained in production as well. Want to know how we approach this for your specific situation? Get in touch or explore our IoT solutions for more information about our approach.

Previous blogitem Next blogitem
Questions about
your project?
Are you looking for a partner in technology or do you have a specific challenge? Our team of experts is ready to help you.
Have a specialist
call you back
Send us a message
Have a specialist
call you back
Leave your details and we will contact you personally.
Send a message for personal contact
Leave your details and we will contact you without obligation.