After signing a quote for IoT product development, the project typically begins with a kickoff, followed by a requirements and specification phase, iterative development phases, and ultimately preparation for series production. The exact path varies by project, but the overall structure is recognizable for virtually any IoT development trajectory. In this article, we answer the most frequently asked questions about what happens after the signature — from the first steps to the moment your product is ready for market.
What happens immediately after signing the quote?
Immediately after signing the quote, a kickoff takes place. In that first meeting, both parties align expectations, the team members involved are introduced, and the planning is made concrete. This is the moment when the collaboration truly begins and the foundation is laid for a smoothly running project.
During the kickoff, a number of practical matters are arranged. Who is your dedicated point of contact? Which communication channels will you use? How often will progress meetings take place? By establishing these agreements early, you prevent misunderstandings later in the process.
In addition to the organizational side, the project scope is also reviewed once more. The quote describes what will be built, but the kickoff goes deeper into the background of the product, the intended users, and the technical constraints. This gives the development team the context it needs to make sound decisions during the embedded software development and hardware development that follow.
How does the requirements and specification phase work in IoT projects?
The requirements and specification phase in IoT projects is the step in which functional wishes are translated into concrete technical requirements. Together with you, the team establishes what the product must be capable of, under what conditions it operates, and which standards or certifications it must meet. This phase forms the technical foundation for all development work that follows.
Good requirements are specific and measurable. "The device must respond quickly" is not a requirement. "The latency between sensor input and cloud notification must not exceed 500 milliseconds" is. That level of precision prevents disputes midway through the project and helps the team make the right architectural decisions.
Functional and non-functional requirements
Functional requirements describe what the product does: what data does it collect, how does it communicate with the cloud, what actions can a user perform remotely? Non-functional requirements address how the product does it: energy consumption, reliability, security, and scalability. Both types are equally important, especially in IoT applications where power electronics and wireless connectivity come together in a compact design.
Cybersecurity and connectivity
In IoT products, security is not an afterthought. Decisions about encryption, authentication, and the firmware update process are made as early as the specification phase. Who is allowed to access the device? How are software updates rolled out securely? These questions are best answered before the first line of code is written, not after the fact.
What development phases does an IoT product go through from concept to production?
An IoT product typically goes through four main phases: concept development and architectural selection, hardware and software development, integration and testing, and finally preparation for production. These phases rarely proceed in a fully linear fashion; in practice, you work iteratively, where findings from a later phase sometimes lead to adjustments in an earlier one.
Phase 1: Architecture and proof of concept
In the first phase, the team selects the technical architecture. Which microcontroller or processor platform suits the requirements? Which communication protocol will you use for the IoT connection? What does the cloud infrastructure look like? A proof of concept is often built to validate the feasibility of critical components before significant investments are made.
Phase 2: Hardware and embedded software development
In this phase, electronics engineers and embedded software developers work closely together. The hardware is designed, a first printed circuit board (PCB) version is manufactured and tested, and at the same time the embedded software is written. For complex applications — such as motor control or signal processing — programmable logic is also employed through VHDL and FPGA design.
Phase 3: Integration, testing, and validation
Once hardware and software are available, integration testing begins. Does everything work together as intended? Does the system meet the previously established requirements? This includes load testing, environmental testing, and security audits. For products connected to the cloud, the app and cloud services are also tested for reliability and performance.
How is collaboration and communication organized during the project?
Collaboration during an IoT development project is typically organized using an agile approach, in which work is divided into short sprints of one to three weeks. After each sprint, you review the results, reprioritize, and determine the next steps. This gives you as the client regular insight into progress and the ability to make adjustments along the way.
In addition to sprint reviews, there are fixed touchpoints for strategic alignment. A project manager or technical lead serves as your dedicated point of contact and ensures that information is communicated clearly and in a timely manner. Good project management also means that risks are identified early and that you are never caught off guard.
Transparency is the key word here. The use of shared project tools, clear documentation, and regular progress reports ensures that you always know where the project stands. This is especially true for projects involving multiple disciplines, such as products that combine IoT connectivity with power electronics or FPGA logic.
What are common challenges in an IoT development trajectory?
The most common challenges in an IoT development trajectory are unclear or changing requirements, integration issues between hardware and software, and delays caused by component availability or certification processes. By recognizing these challenges early, you can address them before they slow the project down.
Scope creep and changing requirements
As a product becomes more concrete, new wishes often emerge. That is understandable, but without clear agreements it can lead to scope creep: the project grows without the planning or budget scaling accordingly. A clear change management procedure — in which new requests are assessed for impact before being added — keeps the project manageable.
Hardware and software integration
In embedded systems, the boundary between hardware and software is thin. A bug can originate in the firmware just as easily as in the PCB design. Early testing, good debugging tooling, and close collaboration between hardware and software engineers reduce the time spent tracking down these kinds of issues.
Certification and compliance
IoT products brought to the European market must comply with regulations such as the Radio Equipment Directive (RED) and the upcoming Cyber Resilience Act. Certification processes take time and money. By accounting for this as early as the specification phase, you avoid discovering at the end of the project that the design needs to be revised.
When is an IoT product ready for series production?
An IoT product is ready for series production when it has passed the Design Validation Test (DVT), all certifications have been obtained, and the production documentation is complete. This means the product not only works technically, but can also be manufactured reproducibly and reliably in larger quantities.
The move to series production requires more than a working prototype. Production engineering — also referred to as New Product Introduction (NPI) — ensures that the design is suitable for manufacturability. This includes component selection decisions, test procedures on the production line, and agreements with the contract manufacturer regarding quality assurance.
Post-launch monitoring is an aspect that is frequently underestimated. Through remote monitoring, you can see how devices are performing in the field after the production launch, roll out firmware updates, and identify issues before customers are affected. That makes the difference between a product you deliver once and a product you can continue to actively improve.
At Inspiro, we guide clients through the entire process — from the initial kickoff through production support and ongoing maintenance. We combine expertise in embedded systems, IoT connectivity, and power electronics to build products that are not only technically robust, but also ready for market. Want to find out how we can support your project? Contact us for a no-obligation conversation.