At the end of a custom electronics development project, you typically deliver a combination of hardware, embedded software, documentation, and production support. The exact deliverables depend on the project phase and the agreements made upfront. A prototype delivery focuses on working hardware and software. A production delivery additionally includes production files, test procedures, and supplier lists. In this article, we answer the most frequently asked questions about what you can expect at the end of such a project.
What types of deliverables are distinguished in an electronics project?
In a custom electronics project, four main categories of deliverables are distinguished: hardware outputs, embedded software and firmware, technical documentation, and production-related files. Together, these categories form the complete package needed to build, test, and manufacture a product in series.
Each category serves its own purpose. Hardware outputs are the physical and digital designs of the electronics itself. Embedded software and firmware ensure the hardware does what it is supposed to do. Documentation records everything so that others can understand, maintain, or further develop the product. And the production files are what a manufacturer needs to be able to build the product.
In practice, deliverables are also organized by project phase. Early in the project, you deliver research results and architecture documents. Later come prototypes and test reports. At the end of the project, the final production files are delivered. It is advisable to clearly define what will be delivered at each phase, so that expectations are aligned on both sides.
What does the hardware delivery of a custom electronics project include?
The hardware delivery of a custom electronics project consists of the electronic schematics, PCB layouts, bills of materials (BOM), and physical prototypes or pilot boards. These are the files and products that together form the foundation of the final electronics design.
Concretely, this includes the following elements:
- Schematics: the complete electronic schematics of the design, including all components and connections
- PCB layout files: the Gerber files or native CAD files used to manufacture a printed circuit board
- Bill of Materials (BOM): an overview of all components with part numbers, suppliers, and specifications
- Physical prototypes: working boards used to test and demonstrate functionality
- Mechanical integration information: dimensions, connector positions, and mounting points for use in an enclosure
In projects in the power electronics domain, such as motor drives or charging stations, thermal analyses and power calculations are often included as well. These are necessary to demonstrate that the design operates reliably under the intended load conditions.
What embedded software and firmware is delivered?
When delivering embedded software development, you provide the firmware source code, along with the associated build scripts, configuration files, and test suites. The compiled binaries and any bootloaders are also part of the package, so the software can be flashed directly onto the hardware.
A proper embedded software delivery includes at a minimum:
- Source code: fully documented code, preferably stored in a version control system such as Git
- Build scripts and toolchain information: so the software can be built reproducibly
- Compiled firmware: the binary that can be flashed directly onto the target platform
- Unit tests and integration tests: automated tests that demonstrate the software's correct operation
- Configuration files: for parameters that may vary per application or customer
For IoT applications, an additional layer is involved. This includes software for wireless communication protocols, integration with cloud platforms, and connection security. Embedded software development for IoT requires extra attention to updateability: how do you ensure that firmware in the field can be updated safely? That mechanism, also known as an OTA (Over-The-Air) update, is therefore also part of the delivery.
If programmable logic (FPGA) is included in the design, you also deliver the VHDL or Verilog source files, along with the synthesis scripts and the generated bitfiles.
What documentation is included in the final delivery?
The final delivery of a custom electronics project includes a set of technical documents describing the design, operation, and use of the product. Good documentation ensures that the product can be maintained, expanded, and manufactured — even if the original developers are no longer involved.
The documentation you can expect falls into several categories:
Technical design documentation
This covers the system architecture, design choices, and the rationale behind key decisions. Examples include a hardware design document, a software architecture document, and optionally an FPGA design document. These documents are valuable for future development.
User and integration documentation
These are the documents needed by a production partner or end user. Examples include a commissioning procedure, a user manual, and an integration guide for cases where the product is incorporated into a larger system. For IoT solutions, this also includes API documentation for the cloud interface.
Test and validation reports
Test reports demonstrate that the product meets the specified requirements. These may include functional test reports, as well as reports from EMC tests, environmental tests, or safety tests where applicable. These documents are also relevant for certification processes.
How is a project prepared for series production?
A project is prepared for series production by compiling a production dossier containing all the information a contract manufacturer needs to build and test the product. This dossier includes production files, test procedures, quality requirements, and supplier agreements.
Preparing for series production requires a number of concrete steps:
- Design for Manufacturing (DFM) review: the design is assessed for manufacturability, preventing costly modifications later
- Preparing production files: Gerber files, pick-and-place files, solder paste files, and test point lists are provided to the manufacturer
- Qualifying the BOM: components are checked for availability, lead times, and alternatives in case a component becomes unavailable
- Developing a test fixture: a production test setup that allows every manufactured board to be functionally tested
- Running a pilot production: a small series is produced to validate the manufacturing process before the full production run begins
In power electronics, the requirements for production preparation are often more stringent. Higher power levels demand more precise soldering procedures, specific insulation requirements, and more extensive electrical safety testing. It is advisable to discuss these requirements early in the project, so the design can account for them from the start.
What is the difference between a prototype delivery and a production delivery?
A prototype delivery focuses on demonstrating functionality and validating the design. A production delivery is aimed at repeatability, quality assurance, and transferability to a manufacturer. The contents of the package therefore differ considerably.
With a prototype delivery, you receive:
- Working hardware and firmware to demonstrate functionality
- Preliminary schematics and PCB files, which may not yet be fully optimized
- A test report demonstrating that the core functionality works
- Notes and open items for the next design phase
With a production delivery, you additionally receive:
- Final, controlled production files including revision history
- A qualified BOM with approved suppliers and alternatives
- A production test approach and test specifications
- Complete technical documentation for handover to a production partner
- Certification documentation where applicable
A common mistake is assuming that a prototype is immediately ready for production. In practice, several additional steps are required after a successful prototype before a product can be manufactured in series. Keep this in mind when planning your schedule and budget.
Who is responsible for which deliverable in a co-development project?
In a co-development project, responsibilities for deliverables are divided based on expertise and access to information. The client is typically responsible for the product requirements, market decisions, and final approval. The development partner is responsible for the technical design, implementation, and technical documentation.
A clear division of responsibilities prevents misunderstandings and delays. In practice, this looks as follows:
Client responsibilities
The client provides the functional requirements, the operating environment, and the boundary conditions. This includes required certifications, target markets, budget constraints, and the desired product lifespan. The client also approves the prototypes and final designs before the next phase begins.
Development partner responsibilities
The development partner translates the requirements into a technical design and is responsible for the quality and completeness of the technical deliverables. This includes the hardware designs, embedded software development, FPGA logic, and the associated documentation. For IoT projects, the cloud architecture and security approach also fall under this responsibility.
Clear agreements on ownership of deliverables are at least as important as the division of responsibilities. Establish who owns the source code, the schematics, and the documentation. This prevents disputes once the project is complete or if you later wish to engage a different partner for further development.
At Inspiro, we work closely with our clients throughout the entire project, from the initial feasibility study through to production support. We ensure that all deliverables are clearly defined and that you as a client always know what to expect. Would you like to know how we approach this in a concrete project? Feel free to contact us.