A standard IoT product development project typically contains seven milestones: feasibility study, system architecture and design, hardware and software development, integration and system testing, certification and compliance, and finally the transition to volume production (NPI). The exact scope of each phase varies by project, but the sequence is almost always the same. In this article, we answer the most frequently asked questions about this process, so you know exactly what to expect.
How many phases does a typical IoT product development project contain?
A typical IoT product development project contains six to seven phases, depending on the complexity of the product and the market in which it is launched. Most projects progress sequentially through a feasibility study, system architecture and design, hardware and software development, integration and system testing, certification and compliance, and the transition to volume production. For larger projects, a separate pilot phase or production ramp-up is often added.
What connects these phases is that each step builds on the previous one. You cannot begin designing hardware until the architecture is clear, and you cannot test until there is something to test. That sounds logical, but in practice we regularly see teams rushing into the next phase without properly completing the previous one. This creates a great deal of extra work later in the project.
Modern IoT projects are increasingly adopting an iterative approach, such as agile scrum, in which shorter sprints are run within each phase. This gives you the flexibility to make adjustments along the way based on new insights or changing customer requirements, without having to reschedule the entire project.
What does the feasibility study involve in IoT development?
The feasibility study is the first and also one of the most important phases of an IoT project. In this phase, you investigate whether the product is technically achievable, whether the business case holds up, and what risks are involved. You map out the functional requirements, explore available technologies, and make an initial estimate of costs and timelines.
A thorough feasibility study answers three core questions:
- Technical feasibility: Can the product be built with available technology, and are there limitations in the areas of embedded software development, connectivity, or power consumption?
- Commercial feasibility: Is there a market for this product, and does the expected revenue justify the development investment?
- Operational feasibility: Do you have the right people, partners, and processes to execute the project successfully?
Many companies skip this phase out of impatience, but that is rarely a good idea. A feasibility study requires relatively little time and money, yet it can save you from a costly mistake further down the line. Especially with IoT products — where you are dealing with wireless connectivity, cloud integration, and sometimes power electronics — it is wise to think carefully upfront about what you are building and why.
How does the system architecture and design phase unfold?
In the system architecture and design phase, you translate the functional requirements from the feasibility study into a concrete technical blueprint. You determine which components the system contains, how they communicate with each other, and what choices you make regarding hardware, embedded software, and cloud connectivity. This is the phase in which the major technical decisions are made.
Typical topics worked out during this phase include:
- The choice of microcontroller or microprocessor and associated peripherals
- The communication protocol for wireless connectivity, such as Bluetooth, Wi-Fi, LoRa, or LTE-M
- The cloud architecture and data storage, including security measures
- The distribution of functionality between hardware and software
- Power supply design, especially for battery-powered IoT devices
A good system architecture also accounts for future expansions. If you already know that you will want to add a new sensor or support an additional communication channel in two years' time, it is smart to factor that into the design now. This prevents you from having to redesign the entire system later.
During this phase, hardware and software engineers work closely together, because decisions made in one area directly affect the other. A compact PCB layout, for example, can impose constraints on antenna performance, while the choice of a particular operating system influences the possibilities for embedded software development.
What is the difference between hardware and software development in IoT projects?
Hardware and software development are two parallel tracks within an IoT project, each with its own approach, timeline, and challenges. Hardware development focuses on the physical components of the product, such as the circuit board, sensors, power supply, and enclosure. Software development encompasses the embedded software running on the hardware, as well as the cloud services and any apps that control and monitor the system.
Hardware development: from schematic to PCB
Hardware development begins with elaborating the electronic schematic based on the system architecture. This is followed by PCB design, prototype production, and extensive testing to verify that the hardware functions as intended. With IoT products, you also address specific challenges such as power management, electromagnetic compatibility (EMC), and the integration of wireless modules.
In power electronics applications — such as motor drives or charging stations — additional requirements apply in the areas of power electronics, thermal management, and safety. This makes hardware development in this domain technically demanding and time-consuming.
Software development: from firmware to cloud
Embedded software development involves writing firmware for the microcontroller, implementing communication protocols, and building the interface with cloud platforms. In more complex systems, programmable logic via VHDL and FPGA is also used — for example, for time-critical signal processing or interfacing with specific hardware.
A key advantage of software development over hardware is flexibility: software can be updated after delivery via a firmware update, whereas a hardware defect in production is far more costly to correct. This is one of the reasons why, during the design phase, you want to implement as much functionality as possible in software.
When does integration and system testing take place in the project?
Integration and system testing take place after the hardware and software have been developed and validated separately. In this phase, all components are brought together and the system is tested as a whole: does the hardware work correctly with the firmware, does the device communicate reliably with the cloud, and does the system meet the functional requirements from the feasibility study?
System testing is more than simply checking whether everything works. You also test the limits of the system: what happens with a poor wireless connection, how does the device respond to a power interruption, and how does the system perform at extreme temperatures? These kinds of tests reveal weaknesses that are not always visible in a laboratory environment.
In practice, integration and testing run partially in parallel with development. As soon as a subsystem is ready, testing begins, so that problems are identified early rather than at the very end of the project. This iterative testing process aligns well with an agile scrum approach and significantly reduces the overall timeline.
What does the certification and compliance milestone involve for IoT devices?
The certification and compliance milestone encompasses all activities required to demonstrate that the IoT device meets the relevant regulations for the intended market. For the European market, this includes CE marking, but depending on the product and application, other certifications may also apply — such as FCC for the US market or specific safety standards for industrial applications.
For IoT devices, the most common certification processes are:
- CE marking: Mandatory for products placed on the European market, including requirements in the areas of EMC, low voltage, and radio equipment (the RED directive)
- Cybersecurity: With the introduction of the Cyber Resilience Act, IoT manufacturers in Europe are required to demonstrably bring secure products to market
- Functional safety: For applications in industrial or medical sectors, additional standards apply, such as IEC 61508 or IEC 62443
- Wireless certification: Modules with Bluetooth, Wi-Fi, or other wireless technologies often require their own certifications from the relevant standards organizations
Certification is a phase that should not be left until the last moment. Test laboratories sometimes have waiting times of several weeks, and if a test fails, you need time to make adjustments and retest. Plan this milestone early in the project schedule and allow for possible iterations.
How does the transition from prototype to volume production (NPI) unfold?
The transition from prototype to volume production, also known as New Product Introduction (NPI), is the phase in which the developed product is prepared for production at scale. This goes beyond the product itself: you also set up the production processes, validate the manufacturability of the design, and ensure the supply chain is in order.
The NPI phase typically includes the following steps:
- Design for Manufacturing (DFM) review: You verify whether the design can be produced efficiently and cost-effectively, and adjust it where necessary
- Pilot production: You produce a small series to validate the production process and identify any bottlenecks
- Production test procedures: You develop automated tests to be carried out during production to guarantee the quality of each device
- Supply chain: You select and qualify suppliers for components and assembly, and ensure sufficient buffer stock for critical parts
- Production ramp-up: You scale production to the desired volume, with attention to quality assurance and continuous improvement
A common mistake is sending the prototype directly to the factory without a thorough DFM review. A prototype is built to demonstrate that something works, not to be produced efficiently. Small adjustments to the design can significantly reduce production costs and increase reliability.
At Inspiro, we guide clients through the entire journey of embedded systems development and IoT — from the initial feasibility study through the NPI phase and beyond. We work closely with our clients to ensure that every milestone is completed successfully and that the final product meets all technical and commercial expectations. Want to know how we approach this for your specific project? Contact us for a no-obligation conversation.