What test reports do you receive upon delivery of a custom electronics design?

14 August 2026

When a custom electronics design is delivered, you typically receive several test reports: a functional test report, a design verification report (DVR), and — depending on the application — an EMC and safety report. Which documents are delivered depends on the project phase, the industry, and certification requirements. In this article, we answer the most frequently asked questions about test documentation for custom electronics, from prototype phase to production handover.

What types of tests are performed during electronics development?

During the development of custom electronics, several types of tests are performed depending on the project phase. The most common are functional tests, electrical verification tests, EMC tests, environmental tests (such as temperature and humidity), and software integration tests. Each type of test has its own purpose and produces its own report.

In the early development phase, the focus is on validating the basic design — measuring voltages, currents, and signal timing on the PCB design. Once the embedded software is available, integration tests follow in which hardware and software are validated together. For IoT applications, connectivity tests are added as well, such as testing wireless connections, cloud services, and security protocols.

As the design matures, testing shifts toward the system level. At that point, the goal is to validate the complete product under realistic operating conditions. For power electronics — such as motor drives or charging stations — load tests and thermal analyses are also standard components of the test program.

What does a functional test report for custom electronics contain?

A functional test report for custom electronics describes which functions were tested, how those tests were performed, and what the results were. At a minimum, the document includes a test plan, the test setup used, the measured values, a comparison against the specifications, and a conclusion on whether the design passed or failed.

A good functional test report is traceable. This means that every test case can be traced back to a functional requirement in the system specification. As a client, you can see exactly which requirements have been verified and which, if any, remain open.

Typical components of a functional test report include:

  • Document identification: version number, date, product name, and the person responsible for testing
  • Test environment: measurement equipment used, software versions, and hardware revision status
  • Test cases: for each function, a description of the test step, the expected outcome, and the measured outcome
  • Pass/fail verdict per test case
  • List of open findings or deviations
  • Final conclusion and signature of the person responsible for testing

For embedded software development, it is also common practice to include software-specific test results, such as unit test coverage and integration test results. This provides insight into the quality of the software component alongside the hardware.

What is an EMC and electrical safety report, and when is it required?

An EMC and electrical safety report documents the results of tests that demonstrate a product complies with electromagnetic compatibility standards and electrical safety requirements. This report is mandatory when you want to bring a product to the European market and need CE marking, or when sector-specific standards apply.

EMC stands for electromagnetic compatibility. It concerns whether a product emits disruptive emissions that could affect other devices, and whether the product itself is resistant to electromagnetic interference from external sources. Electrical safety tests verify that the product poses no risk to users — for example, through insulation faults or improper grounding.

For most B2B products in sectors such as industrial automation, medical technology, or power electronics, these tests are not optional. Relevant standards include:

  • EN 55032 and EN 55035 for EMC emissions and immunity
  • IEC 62368-1 for electrical safety of audio and IT equipment
  • IEC 61000 series for specific immunity and emissions tests
  • Sector-specific standards, for example for medical or automotive applications

The report itself contains the test setup, the standards applied, the measured values, and an assessment of whether the product complies. When a product fails the tests, the deviations are documented along with recommendations for design modifications.

What is a design verification report (DVR) and what does it contain?

A design verification report (DVR) is a document that demonstrates the design meets all requirements set out in the system specification. The DVR is the central verification document of a development project and brings together all test results in relation to the requirements established at the start of the project.

The DVR differs from a functional test report in that it is broader in scope. Where a functional test report focuses on testing specific functions, the DVR links every requirement to a verification method and its corresponding result. This can be a test, but also an analysis, an inspection, or a demonstration.

A complete DVR typically contains:

  • A traceability matrix linking each requirement to a verification method and its result
  • References to underlying test reports, analyses, and calculations
  • An overview of all open items or accepted deviations
  • Formal approval by the responsible engineer or project manager

For complex projects in embedded systems development — such as systems for robotics or satellite applications — a DVR is often a contractual requirement. It gives the client confidence that the design has been systematically verified and that nothing has been overlooked.

How does a prototype test report differ from a production-ready test report?

A prototype test report focuses on validating the design and identifying defects at an early stage. A production-ready test report demonstrates that the design is stable, repeatable, and suitable for series production. The scope, depth, and purpose of the two documents are fundamentally different.

With a prototype, the goal is to learn. Testers actively look for weaknesses in the design, measure margins, and document deviations so the design can be improved. The report often includes annotations, findings, and discussion points that lead to design changes.

A production-ready test report has a different character. It demonstrates that the design delivers the desired performance within production tolerances and that the test procedures are suitable for use on the production line. Typical elements that receive extra attention here include:

  • Test coverage: which parameters are tested on every produced unit
  • Test speed: the test procedure must fit within the cycle time of the production line
  • Limit values: established pass/fail thresholds based on measured variation during the prototype phase
  • Test fixtures and automation: description of the test setup used for production

The prototype test report is therefore a development document, while the production-ready test report is a quality document that forms the basis for ongoing production control.

What test documentation is important for the handover to production?

For a successful handover to production, you need at least four types of test documentation: the design verification report, the production test strategy with associated test specifications, the test fixture documentation, and the first article inspection (FAI) reports. Together, these documents provide evidence that the design is ready for production.

The handover to production — also known as New Product Introduction (NPI) — is a critical milestone. Missing or incomplete test documentation leads to ambiguity on the production line, higher reject rates, and quality issues that are difficult to trace.

The most relevant documents for the production handover are:

  • Design verification report (DVR): proves that the design meets all requirements
  • Production test specification: describes which tests are performed on every unit, including limit values and procedures
  • Test fixture documentation: drawings, schematics, and software for the test setup used on the production line
  • First Article Inspection (FAI) report: results from the first produced units, confirming that the production process has been set up correctly
  • Known deviations and workarounds: documented exceptions that the production partner needs to be aware of

For IoT products and embedded software development, the firmware flashing procedure and its associated verification step must also be part of the production documentation. Without a documented and tested flashing procedure, you risk units leaving the production line with incorrect or incomplete firmware.

How do you assess the completeness of received test reports?

You assess the completeness of test reports by verifying that all functional requirements are covered, all relevant standards have been addressed, and all documents are traceable to the system specification. A simple checklist helps you quickly identify any gaps in the delivered documentation.

Start with the traceability matrix. If it is missing, it is difficult to determine whether all requirements have been verified. Then check whether the test reports contain a clear pass/fail conclusion and whether open items have been documented with a status.

Use the following questions as a guide when conducting your review:

  1. Is a DVR or comparable overview document present?
  2. Can all functional requirements from the specification be found in the test results?
  3. Have EMC and safety tests been performed if they are required for the application?
  4. Do the test reports include a version number, date, and signature?
  5. Has the measurement equipment used been calibrated and documented?
  6. Have open findings been recorded with a priority and an owner?
  7. Has the software version used during testing been documented?

If one or more of these items are missing, the test documentation is incomplete. This is not necessarily a problem in every case, but you will want to understand why something is absent and whether it was a deliberate decision or an oversight. Always ask for clarification before accepting the delivery.

At Inspiro, we ensure that test documentation is not an afterthought but an integral part of the development process. From the first prototype tests through to the production handover, we guide you in building a complete and traceable set of test reports — so you can move forward with confidence. Want to know how we approach this for your project? Get in touch with us.

Previous blogitem Next blogitem
Questions about
your project?
Are you looking for a partner in technology or do you have a specific challenge? Our team of experts is ready to help you.
Have a specialist
call you back
Send us a message
Have a specialist
call you back
Leave your details and we will contact you personally.
Send a message for personal contact
Leave your details and we will contact you without obligation.